Infrastructure Connection |
(average in €): |
|
|
 |
|
|
Electricity: |
depends on many factors (the operating forces, the removal power station from the point of supply, etc..) |
|
|
Water: |
2,000 EUR |
|
|
Heating: |
Energy approval: 30 euros / kW installed capacity, construction of ports: an average of 10,000 euros) |
|
|
Gas: |
900 euros (piping length up to 20m) |
|
|
Sewage: |
1000 - 1500 EUR |
|
|
Telephone: |
50 EUR |
|
|
Internet - cable: |
free |
|
|
Internet - ADSL: |
free |
|
|
 |
|
|
Infrastructure cost |
(average in €): |
|
|
 |
|
|
Land development fee (€/m²): |
53-164 eura/m2 |
|
|
Land use fee (€/m²): |
depends on the purpose of use, scope and degree of regulation of land, its position in the settlement and others. |
|
|
Lease of construction land (€/m²): |
|
|
|
Electricity: |
5.7 euro cents / kWh |
|
|
Heating: |
the energy consumption of 4.02 euro cents / kWh, the installed capacity of 1.3 euros / kW |
|
|
Water: |
1.0 eura/m3 |
|
|
Sewage: |
0,63 eura/m3 |
|
|
Gas: |
0.3 euros / cm3 |
|
|
Internet: |
20 euros (8Mb / s) |
|
|
 |
|
|
Local Investment Incentives: |
|
|
|
 |
|
|
1: |
|
|
|
2: |
|
|
|
3: |
|
|
|
4: |
|
|
|
5: |
|
|
|
6: |
|
|
|
7: |
|
|
|
8: |
|
|
|
 |
|
|
|