Infrastructure Connection 

(average in €): 

Electricity:  depends on many factors (the operating forces, the removal power station from the point of supply, etc..)
Water:  2,000 EUR
Heating:  Energy approval: 30 euros / kW installed capacity, construction of ports: an average of 10,000 euros)
Gas:  900 euros (piping length up to 20m)
Sewage:  1000 - 1500 EUR
Telephone:  50 EUR
Internet - cable:  free
Internet - ADSL:  free

Infrastructure cost 

(average in €): 

Land development fee (€/m²):  53-164 eura/m2
Land use fee (€/m²):  depends on the purpose of use, scope and degree of regulation of land, its position in the settlement and others.
Lease of construction land (€/m²): 
Electricity:  5.7 euro cents / kWh
Heating:  the energy consumption of 4.02 euro cents / kWh, the installed capacity of 1.3 euros / kW
Water:  1.0 eura/m3
Sewage:  0,63 eura/m3
Gas:  0.3 euros / cm3
Internet:  20 euros (8Mb / s)

Local Investment Incentives: 

1: 
2: 
3: 
4: 
5: 
6: 
7: 
8: 
  BACK

Novi Sad


Južnobački okrug
Vojvodina
www.novisad.rs
Area 702 m²
Population 335701 podaci RSZ za 2011
Workforce 210903 podaci RSZ za 2002
Employed 130200 podaci RSZ za 2012
Unemployed 30387 podaci RSZ za 2013
Unemployment Rate 18.74%
Average Gross Wage 587 podaci RSZ za 2012
Average Net Wage 423 podaci RSZ za 2012

Investment locations: 

  Studio Berar
Land 7567 m²
Buildings 1300 m²
  PROMIST
Land 89353 m²
Buildings 37452 m²
  Banglades Location
Land 78914 m²
Buildings 5230 m²
  COM-SPED
Land 9402 m²
Buildings 5475 m²
  Proizvodna hala
Land 1300 m²
Buildings 700 m²
Show all 
Serbian Development Agency (RAS)
Resavska 13-15, 11000 Beograd, Srbija
T. +381.11.3398.510
F. +381.11.3398.550
E. office@ras.gov.rs