Suppliers database Locations database Projects database Municipalities database Users Srpski

General Data: 

 
Location Name:  Industrijski Kompleks “Taške DOO”
City/Municipality:  Golubac

Land and Building Information: 

 
Total Land Area (m²):  13955
Total Buildings Area (m²):  3502

Location Description: 

The complex is located at one of the best strategic locations in Eastern Serbia, just 8 km from the Danube River. The region of East Serbia has the largest unused logistic potential in the country. The complex lies on the Danube highway itself and represents a serious logistic hub for a wide range of industrial activities. The average distance of the complex from the most important border crossings is 3h. Distances from important points: Landing points - Exit to the E-75 highway is 55km - 52min. Belgrade 118 km - 1h34 min. Gradina border crossing 330km - 4h. Border crossing Batrovci 234km - 3h. Border crossing Horgos 317km - 3h42min. Border crossing Vatin 82km - 1h52 min. River logistics points - Luka Belgrade 120km - 1h42min. Harbor Dunav 109km - 1h50 min. Infrastructure of the complex and usage permit: Total area of ​​the plot is 13.955 m². Cadastre parcel no. 482 / 1. Package of complete project documentation. Useful permits including ADR. Total area of ​​facilities in the complex is 3.502 m². The complex is fully air-conditioned. Heating and cooling in the main hall in 2 climate zones. Separate rooms for workers (magazines, restaurant). The complex owns its well A limit with 10T buffer tanks. 4 loading ramps. ADR Environment for TNG Station. Water purification system. Possible purposes of the industrial complex: Very wide potential purpose. The complex can accept almost all types of liner production length up to 100m. The complex in Branicevo is ideal for producing Biskvita type, Clothes, Wood processing. Due to 100% of the air-conditioned indoor space, it is possible not to support manufacturing manufac ture. Development potential of the complex: Possibility of expansion of the infrastructure from 3.502 m² to 4.844 m². Included package of project documentation and building permits for expansion. Social and Environmental Consciousness: The complex in Branicevo is one of the largest of its kind and lies near the river Pek and, as such, has a positive impact on its environment in a social and ecological aspect. The Golubac Municipality to which Braničevo belongs belongs to a large rate of non-employment, which is reflected throughout the region of Eastern Serbia. At the end of the previous production, the complex employed 300 industrial personnel. At this moment, Branicevo is a home of a large workforce that could find its new engagement with additional training, in a newly-designed complex. In order to preserve the environment, the complex relies on its wastewater treatment plant "Jaroslav Cherni" with a capacity of 100 m³ at 24 h. To heat the complex as an energy source, a LPG is used, which is economical and has an additional benefit of low content of contaminants released during combustion. For lighting purposes, the complex relies on LED lighting which is economical and has the lowest rate of waste heat.
 
  BACK

Industrijski Kompleks “Taške DOO”


Golubac
Braničevski okrug
Istočna Srbija
Land Area 13955
Buildings Area 3502
Number of buildings 12
Different options possible
Construction land



Serbian Development Agency (RAS)
Resavska 13-15, 11000 Beograd, Srbija
T. +381.11.3398.510
F. +381.11.3398.550
E. office@ras.gov.rs