Electricity:  Yes
Total Power (kVA):  1,2 MW
Distance to the distribution station (m):  200 m
Water:  Yes
If there is industrial water pressure (bar):  3,5
Compressed Air:  No
Gas Connection:  Yes
Pressure (bar):  3
Distance to the distribution station (m):  200 m
Heating:  No
Internet Connection:  Yes
Connection Type and Total Transfer Rate:  ADSL ili Wireless
Phone:  Yes
Sewage:  Yes
Road Connection:  No