Suppliers database Locations database Projects database Municipalities database Users Srpski

Infrastructure:

 
Electricity:  Yes
Total Power (kVA):  8MW
Remarks:  Seval is powered by electric power from the transmission system through a transformer 110/6KV.
Water:  Yes
Remarks:  Main line of drinking water was placed along the road Uzice-Cacak and owned by the municipal water supply. Seval has its own recycling unit with appropriate chemical preparation.
Compressed Air:  Yes
Pressure (bar):  8
Remarks:  Seval has compressed station with two threaded kompresora.Planirana purchasing of another viajčnog reserve capacity compressor 36m3/min.
Gas Connection:  Yes
Remarks:  Seval is powered by natural gas through the IAS of the factory to the overpass that leads to the terminal.
Heating:  Yes
Heating Type and Description:  toplovodna kotlarnica kapaciteta 2x4MW
Remarks:  there is a possibility of a third boiler up to 5MW
Internet Connection:  ...
Phone:  Yes
Remarks:  Seval has a digital telephone exchange with a capacity of 640 local connections and 256 prenosnika.Trenutno has 20 free shops.
Sewage:  No
Remarks:  Impol Shawwal has its own sewage system for sanitary waste water drain, which runs along the western arm of the side Tewrminala.
Road Connection:  Yes
  BACK

Terminal Sevojno


Užice
Zlatiborski okrug
Zapadna Srbija
Land Area 94060
Buildings Area 0
Number of buildings 0
Lease
Construction land



Serbian Development Agency (RAS)
Resavska 13-15, 11000 Beograd, Srbija
T. +381.11.3398.510
F. +381.11.3398.550
E. office@ras.gov.rs